Page | 023 Summary of Project and Product Fire Safety Requirements R2 Megapack units will have a sparker system to prevent the build-up of combustible gases as described in the Fisher Engineering Report, 2035- 03R22035-04R, Page 11. R3 Megapack units will have a battery management system with the protection, controls and monitoring as described in the Fisher Engineering Report, 2035- 03R22035-04R, Page 10. R4 R5 Megapack units will be tested and listed to UL 1973 R6 R7 R8 The battery cells incorporated into the Megapack units will be tested and certified to UL 1642 standard for lithium batteries R9 R10 R11 Megapack units will be tested and listed to UL 9540 R12 Megapack data will be accessible remotely via the 24/7 Tesla Network Operations Centre R13 Megapacks will be installed in accordance with their listing and the Tesla Megapack 2/XL Design and Installation Manual, and achieve the minimum recommended separation. R14 Product Product Product Product Megapack units will have an active thermal management system comprising of liquid cooling system installed within each enclosure providing thermal management to internal components to limit heat diffusion as described in the Fisher Engineering Report, 2035-03R22035-04R, Page 6 - 7. Product Megapack units will have system shutdown/disconnect with multiple levels of passive and active electrical protections, including battery module overcurrent protection via fusible links on the DC side of the modules, inverter DC and AC protections, and ground fault detection as described in the Fisher Engineering Report, 2035-03R22035-04R, Page 11. Product Megapack units will have passive circuit protection and design with fused disconnects and DC disconnect switches, in addition to ground fault detection/interruption and over voltage protection as described in the Fisher Engineering Report, 2035-03R22035-04R, Page 10 - 11. Product If the Megapack BESS units operate out of normal voltage parameters, the BMS will trigger fault and alarm monitoring indicators and initiate the protection system to disconnect as described in the Fisher Engineering Report, 2035-03R22035-04R, Page 10. Product Inverter modules will be equipped with both DC protection via high-speed fusing for passive or active isolation or battery module, as well as dedicated AC contactor and AC fuses will an abnormal electrical event occur at the inverter modules on the AC side of the circuit as described in the Fisher Engineering Report, 2035-03R22035-04R, Page 10 - 11. Product Product Product Project Tesla have undertaken additional internal destructive fire testing, beyond that required by the UL 9540A test and fire modelling, to help understand the risk of fire propagation to adjacent BESS units. The additional testing and fire modelling concluded that, in the unlikely event of a fire, it would not propagate from one Megapack unit to an adjacent unit installed at minimum clearances as per the Tesla Megapack 2/XL Design and Installation Manual. Project Vegetation buffer zones will be included, with a minimum of 10 m clearance between the Megapacks and the fence line. The entire fenced area will be gravel and void of vegetation. This will allow for access by the NSW RFS fire tender in accordance with the NSW RFS request. Project R15 Proprietary and Confidential, Disclosed Under NDA Tesla, Inc. | 23 |