Search Tesla Megapack Publications search was updated real-time via Filemaker on:

Page | 003 1 PRINCIPAL CONTRACTOR PRINCIPAL CONTRACTOR For the purposes of the Work, Health and Safety Laws, unless otherwise agreed by Tesla, the following is applicable: • The company or entity listed as the Asset Operator in Section 2 Project/Job Details is the Principal Contractor for carrying out all works relating to the below scope work taking place during the project; • The Principal Contractor is hereby authorised to have management or control of the workplaces necessary to discharge its duties as Principal Contractor. Additionally, the Principal Contractor is authorised to manage and control access to the Site and have regard to all relevant matters, including risks to health and safety arising from unauthorised access, the likelihood of unauthorised access occurring and to the extent that unauthorised access to the workplace cannot be prevented; and • The Principal Contractor is responsible for implementing all requirements outlined in this EHS 2 PROJECT/JOB DETAILS Management Plan. Project/Site Name Location Asset Developer Asset Operator: Asset Operator ABN: Tesla Electrical Works Coordinator: Business Address Tesla Utility Operations and Maintenance Manager HV Operating Authority: Tesla Site Authority: Tesla EHS Representative: SITE DETAILS Riverina Energy Storage System (RESS) 336 Donald Ross Dr, Darlington Point NSW 2706 Edify Tesla Motors Australia Pty Ltd 68 142 889 816 Dane Seymour Level 14, 15 Blue Street, North Sydney NSW 2060 Liam Pacini Jesse Nugent Dean Connell Scott Bruce Tesla operates a Battery Energy Storage Systems (BESS) owned by Edify (RESS 1, RESS 2 and DPESS). All Sites together will be referred to as the Riverina Energy Storage System (The RESS). Tesla’s operational area / Site boundary of the RESS is outlined within Section 25 of this EHS Management Plan. The RESS consists of the details of these are outlined as follows: • The Sites are co-located with the Darlington Point Solar Farm and connect into the Darlington Point sub- station, operated by TransGrid. The Sites are divided into three Sections: o RESS 1: 60MW / 122.7MWh, involving 48 Megapack 2 o RESS 2: 65MW / 130MWh, involving 52 Megapack 2 o DPESS: 25MW / 50MWh; involving 16 Megapack 2XL The RESS is located on a rural property adjacent the Darlington Point Solar Farm with a total capacity of 150MW/300MWh, consisting of a total of 116 Tesla Megapacks. Proprietary and Confidential, Disclosed Under NDA Tesla, Inc. | 3 |