Search Tesla Megapack Publications search was updated real-time via Filemaker on:

Page | 011 Learn more about the 4400kVA Transformer Transformer design To accommodate two Tesla Megapack 2XL’s on each side of the transformer, for a total of four Megapack 2XL’s. To meet the latest revisions of the following battery storage manufacturer Tesla transformer requirements: Tesla Megapack – Above Grade Transformers. Transformer to be designed to accommodate the 4-hour Megapack configuration. Tesla Megapack 2XL Design and Installation Manual Appropriately for the conditions of use including solar duty, ambient temperatures, and harmonic loading (k-factor of 2 or higher) To meet all applicable UL and IEEE standards including C57.12.00, C57.12.28, C57.12.34, C57.12.70, C57.12.80, C57.12.90, and C57.18.10 To be pad mount, outdoor, UL nameplated With natural ester insulating fluid To be sealed-tank construction As dead-front loop feed HV configuration For step-down, bi-directional operation With continuous windings without splices With an electrostatic shield between the HV and LV windings and an externally accessible ground shield bushing With a NEMA 3R termination cabinet With a five position tap changer with +/- 2@ 2.5% HV taps With Bay-O-Net or internal expulsion and coordinated back-up current-limiting primary fuse protection One-piece 600A HV bushings in HV connection cabinet With a HV two position load break oil-immersed rotary switch LV Spade terminals to accommodate horizontal lug spacing of 2.0” With a 14-hole grounding bus plate and will accept NEMA two-hole ground lugs in the LV compartment HV Compartment to have a standard NEMA two-hole ground pad With liquid thermometer, liquid-level and pressure/vacuum gauges with Form C alarm contacts prewired to terminal blocks in externally accessible enclosure With a Schrader-type valve With a cover-mounted automatic pressure relief valve as required to prevent tank rupture Oil drain, fill, and oil sample and pressure relief valves With a nitrogen blanket With seismic anchoring provisions for the site indicated above and for 3/4" hardware With RAL-7035 color finish in accordance with C57.12.18-2014 and spare touch-up paint Rated for continuous operation Reading on: The Impact of Impedance on Transformer Design Transformer Factory Acceptance Test Factory Acceptance Test shall include all tests required by IEEE C57.12.90 specifically the as listed below designated as “Routine” and “Design”. |